destinyjonesd7073 destinyjonesd7073
  • 01-09-2017
  • Mathematics
contestada

If it takes six men six days to dig six holes, how long will it take one man to dig half a hole?

Respuesta :

INOEVREing
INOEVREing INOEVREing
  • 01-09-2017
6x/6y=6z
X/?Y=1/2Z
36=6
1hole take 1 man x 6 days
1/2 hole needs 1 man with 3 days
Answer Link

Otras preguntas

Find x in circle O (The figure is not drawn to scale)​
How much force would you need to cause a 20-kilogram object to accelerate in a straight line to 20 m/s2?
I just took a test and my brain is fried please help thanks
Nihkil surveyed 20 students at his middle school and 13 of them had at least one sibling. What percent of the students surveyed have at least one sibling?
Time left 0:35:32 Three steel rod (E = 200 GPa) supports 36 KN Load P. Each of the rods AB and CD has a 200 mm? cross- sectional area and rod EF has 625 mm2 cro
Select all ordered pairs that correspond to input-output pairs of the function y = −9x + 5A: (-22, 3)B: (4, 0)C: (8, -67)D: (6, -49)
Which function is best represented by this graph? Brainliest
what is an easy method to workout 35% of 70
please help with 1 or 2 i’ll mark brainly
A gardener has 108 feet of fence to use to surround a rectangular garden. Which inequality can be used to represent the length of a garden if the width is 20 fe