how do you find the mean completion time of a PERT network diagram?​

Respuesta :

okekesarah01642112
okekesarah01642112 okekesarah01642112
  • 02-01-2021

Answer:

PERT is an estimating technique that uses a weighted average of three numbers (see below) to come up with a final estimate. The resulting PERT estimate is calculated as (O + 4M + P)/6. This is called a "weighted average" since the most likely estimate is weighted four times as much as the other two values.

Answer Link

Otras preguntas

How do you use Bill of rights in a sentence
simplify as much as possible.Assume that all variables represent positive real number4x√32xv^2 + v√2x^3
How do you use Bill of rights in a sentence
Write 3/5, 1 2/3, 15/7, 1/2, 2 5/8, and 9/4 in order from least to greatest!!!
Which is a solution to the equation y=5x-6
What are Radio Waves?
Hello how do you solve for x a= x-b/y
Rheumatic fever is a bacterial disease that can result in degeneration of heart valves that would cause?
Find the next two terms in the following sequence. 13, -5, -35, -77,...
Which of the following is the equation of a line parallel to the line y=3x+2, passing through the point (10,1)? A. 3x - y=29 B. 3x + y=29 C. -3x - y=29 D. 3x +