rdalleman6
rdalleman6 rdalleman6
  • 01-07-2020
  • Engineering
contestada

Time, budget, and safety are almost always considered to be
1. Efficiency
2. Constraints
3. Trade-offs
4. Criteria

Respuesta :

IHaveAQuestion123
IHaveAQuestion123 IHaveAQuestion123
  • 01-07-2020

Answer:

The answer is option # 2. (Constraints).

Answer Link
helenabooth080
helenabooth080 helenabooth080
  • 01-07-2020
the answer is constraints
Answer Link

Otras preguntas

a concrete foundation for a building has the shape of a rectangular prism. the foundation is 14 yards long, 12 yards wide, and 2 yards high. if concrete costs
Which area of the stage was out of view of the audience
Which of the following best describes a haiku? A. a long Chinese poem B. a poem of seven syllables and four lines C. a short Japanese poem D. a poem of seventh
Why is Mama concerned about the plant? What can the reader infer about Mama, based on her concerns? Act 1 Scene 1 of A Raisin In the sun
A bag contains 7 red marbles and 4 blue marbles. A marble is taken at random from the bag and replaced. Another marble is taken from the bag. Work out the prob
the length of a rectangle is 3 more than twice its width. the total area of the rectangle is 54 square units. what is the width and length of the rectangle? rep
2 Find the area of the quadrilateral below. Give your answer in cm² and give any decimal answers to 1 d.p.
What type of element is SBR4
what is the smallest positive integer with six positive odd integer divisors and twelve positive even integer divisors?
standard precautions differ from transmission-based precautions in that standard precautions