lillymcginn lillymcginn
  • 02-11-2019
  • Mathematics
contestada

A lift that weighs 300N moves a man with a weight of 950N upwards by 12m. How much work is done to move the lift this height?

Respuesta :

skyluke89
skyluke89 skyluke89
  • 07-11-2019

Answer:

15,000 J

Step-by-step explanation:

Since the lift also carries the man, the total weight of the man+lift system is

[tex]F=300 N + 950 N = 1250 N[/tex]

The work done in moving the lift upward is

[tex]W=Fd[/tex]

where

F is the weight of the lift+man combined system

d is the displacement

In this problem,

F = 1250 N

d = 12 m

Substituting,

[tex]W=(1250)(12)=15,000 J[/tex]

Answer Link

Otras preguntas

The English colonies of New York and New Jersey were originally _____. HISTORY HELPP!! A. royal colonies B. Quaker colonies C. southern colonies D. proprietary
Write an expression to describe the sequence below. Use n to represent the position of a term in the sequence, where n = 1 for the first term. 53, 106, 159, 212
The importance of the events in Hungary in 1956 for the development of the cold war
Pig latin is a language game in which english words are slightly modified so that non-pig latin speakers have difficulty understanding what is being said. the r
comfortable or unbearable feeling or situation often requires a
If f(x) = x2 – 25 and g(x) = x – 5, what is the domain of f/g(x)
what was Jacob Rios goal in the late 1800s?
If Helena uses 1 1/4 cup of water to make fabric softener how much vinegar does she need 2 1/2 water is equivalent to 1 1/4 chose of vinegar
What was the most common fruit for the Sumerians? figs grapes melons dates
Money obtained through various types of loans is called: