ridume2020 ridume2020
  • 02-01-2024
  • Mathematics
contestada

Montu finishes a piece of work in 24 days. How much work will he complete in 8 days?​

Respuesta :

ahmedmaham984
ahmedmaham984 ahmedmaham984
  • 02-01-2024

Answer:

Therefore, he will complete 1/3 of the work in 8 days as 24 ÷ 8 = 3.

Answer Link

Otras preguntas

What is tan 11pi/6?
(x + 3)2 + (y – 5)2 = 1 What would be the center of this?
A. A plumber charges $65 for a diagnostic check. After the check, it is $85 per hour for the work. Write an equation to model this sitaution. B. Using the equat
A triangle has sides 12 cm and 22 cm.what are the possible side lengths of the third side
please help i don’t really understand this
what is 8498393 times 3798147 divided by 438943847 minus 5785340 as a fraction in simplest form?
which of these are produced by the testicles? A. Eggs B. semen C. sperm D. Estrogen
Triangle X Y Z has centroid S. Lines are drawn from each point through the centroid to the midpoint of the opposite side to form line segments X W, Y V, and Z T
if a day was a year, how many does it take to make a million years?
What is the mean of the first 5 whole numbers ?