MaThWiZz6123 MaThWiZz6123
  • 02-07-2021
  • Mathematics
contestada

It take 4 people 40 minutes to clean a garden. How long will it take 6 people to clean the same garden

Respuesta :

loconte loconte
  • 02-07-2021

Answer:

4/9 of an hour (26.666 minutes)

Step-by-step explanation:

4 * x * 40/60 = 1

x * 160/60 = 1

x=60/160 = 6/16 = 3/8 (this is the rate for one worker)

~~~~~~~~~~~~~~~~

6 * (3/8) * x = 1

x = 4/9

Answer Link

Otras preguntas

)Lying quad stretches are an effective static stretch for runners because they A: raise muscle stamina during a workout B. lower muscle temperature after a work
What was the jizya in the islamic empire?
This stylistic technique uses concrete words in nonliteral ways to create sharply etched sensory images that catch and hold the reader’s attention.
Jessica has an account with a credit union. Her account earns 2.2% simple interest yearly. Exactly a year and a half ago, she opened her account with $900. How
The boundaries of eras are marked by great worldwide changes in _____.
which region make up the sun atmosphere?
To support your claim and present a strong argument, you should always include
The prefix used for 1000 times the base unit is _____...? a. milli b. centi c. deci d. kilo
Which of the following is true about measles and chicken pox? a. they are both caused by bacteria. b. they are both caused by a virus. c. they have been elim
A lack of vitamin ______, may lead to scurvy. a. c b. a c. b d. k