Estimate the quantity of soil to be excavated from the borrow pit​

Respuesta :

lola2487
lola2487 lola2487
  • 04-08-2019

Answer

1056

Explanation:

for example

A soil is to be excavated from a borrow pit which has a density of 1.75g/cc and water content of 12%. The G is 2.7 the soil is compacted to that water content of 18% and dry density of 1.65g/cc. for 1000 m3 of soil used in fill estimate

Quantity of soil to be excavated from pit in m3

Answer Link

Otras preguntas

A wheel 30 cm in diameter accelerates uniformly from 245 rpm to 380 rpm in 6.1 s . Part A How far will a point on the edge of the wheel have traveled in this ti
HELPPPPPP i will give brainliest!!!!!
Expand the following using the Binomial Theorem and Pascal’s triangle (2x − 3y)^4
Find the value of f(3) given f(x) = − 5x + 2​
which among the following pairs are not isotopes?​
A student-faculty government committee of 4 people is to be formed from 20 student volunteers and 5 faculty volunteers. a. If one person from the group of volun
HW HELP ASAP PLZZZZZ
Mrs. Park is an elderly retiree. Mrs. Park has a low fixed income. What could you tell Mrs. Park that might be of assistance
By casting their ballots for the Constitutional Unionist candidate John Bell in the 1860 election, what did people in Virginia and Kentucky fear
Which of the following is a geometric sequence​